The important role of hospital furniture procurement engineer:
Procurement engineers even participate in the production and supply design of suppliers earlier, so as to further improve the cost control model, early intervention in procurement and synchronous planning procurement.
It is very important for procurement engineers to participate in the design and development of hospital furniture, which can improve the bargaining power of procurement engineers in all links of suppliers and reduce procurement costs. And easy to establish long-term, closer cooperation with suppliers. More conducive to simplify the process of both sides, increase information transparency, reduce the cost of the process. In this way, reasonable profits and enthusiasm of suppliers can be improved.
Procurement engineers can reduce the number of suppliers during the bidding stage of hospital furniture design and reduce the number of suppliers through procurement strategy. The supplier structure is analyzed in detail, and the supply strategies of “sole supply”, “exclusive supply”, “two supply” and “multiple supply” are determined. There are fewer suppliers of products with lower procurement risks and stronger controllability, and the survival of the fittest is emphasized by supporting the development and integration of suppliers. To promote the development of suppliers. Double track system supply, from beginning to end the introduction of full competition. Constantly reduce procurement costs. First-class hospital procurement helps suppliers increase profits and reduce costs. Second-rate hospital procurement reduces costs by reducing costs within hospitals, while third-rate hospital procurement only reduces costs by squeezing the unit price of suppliers.